Assessing schedule delay's impact on total project duration to distribute delay liability remains a controversy. None of existing delay analysis methods is perfect because including an element of assumptions, subjective assessment and theoretical projection. Windows-based delay analysis methods are excellent in identifying and measuring construction schedule delays. Based on a previous study identifying potential problems in available windows-based delay analysis methods, this study proposes an innovative windows-based delay analysis method, called the effect-based delay analysis method (the EDAM method). The EDAM method performs delay analysis using extracted windows and determines delay impacts by considering the effects of delays on the critical path(s). According to its application to hypothetical cases and comparisons with other methods, the EDAM method is efficient in delay analysis and effective in solving concurrent delays and determining schedule shortened. The proposed EDAM method is a good alternative for schedule delay analysis for construction projects.
机译:评估进度延迟对项目总工期的影响以分配延迟责任仍然是一个争议。现有的延迟分析方法都不是完美的,因为其中包括一些假设,主观评估和理论预测。基于Windows的延迟分析方法在识别和测量施工进度延迟方面非常出色。在先前的研究中,发现了可用的基于窗口的延迟分析方法中的潜在问题,本研究提出了一种创新的基于窗口的延迟分析方法,称为基于效果的延迟分析方法(EDAM方法)。 EDAM方法使用提取的窗口执行延迟分析,并通过考虑延迟对关键路径的影响来确定延迟影响。根据其在假设情况下的应用以及与其他方法的比较,EDAM方法不仅可以有效地进行延迟分析,而且可以有效地解决并发延迟和缩短调度时间。所提出的EDAM方法是建筑项目进度延迟分析的一个很好的选择。

著录项

  • 来源
    《International Journal of Project Management》 |2012年第3期|p.385-397|共13页
  • 作者

    Jyh-Bin Yang; Chih-Kuei Kao;

  • 作者单位

    Graduate Institute of Construction Engineering and Management, National Central University, No. 300, Jhongda Rd., Jhongli City, Taoyuan County 32001, Taiwan;

    R&D Center for Construction Project Management, Chung Hua University, No.707, Sec.2, WuFu Rd., Hsinchu, 300 Taiwan;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    delay analysis; claim; schedule analysis; construction project;

    机译:延迟分析;要求;进度分析;建筑项目;