A procedure for critical path method-based scheduling in linear construction projects

机译:线性建设项目中基于关键路径法的调度程序

获取原文
           

摘要

Construction projects having identical or similar units, in which activities repeat from one unit to another, require schedules that ensure the continuous usage of resources from one unit to the next and the maintenance of the network logic between activities at the same time. This paper presents a procedure for critical path method-based (CPM) scheduling in linear construction projects that have repeating activities. The procedure concurrently provides the utilisation of resources without interruption and preservation of network relationships between successive units. With this procedure it is possible to represent activities by variable production rates through consecutive units and assign any kind of relationship type with lag time. The proposed procedure determines the critical units in two categories: logical and resource critical units. A spreadsheet has been developed on a table processor to computerise the procedure. Details of the procedure are described and an example application is presented.
机译:具有相同或相似单元的建设项目(其中活动从一个单元重复到另一个单元)需要时间表,以确保从一个单元到下一个单元的资源的连续使用,并确保活动之间同时保持网络逻辑。本文提出了在具有重复活动的线性建设项目中基于关键路径法(CPM)进行调度的过程。该过程同时提供资源的利用,而不会中断和保留连续单元之间的网络关系。使用此过程,可以通过连续的单位以可变的生产率表示活动,并为任何类型的关系类型指定滞后时间。建议的过程将关键单元分为两类:逻辑关键单元和资源关键单元。已经在表格处理器上开发了电子表格,以将该过程计算机化。描述了该过程的细节,并给出了示例应用程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号