...
首页> 外文期刊>International Journal on Hydropower & Dams >Feasibility study begins at Moragolla, Sri Lanka
【24h】

Feasibility study begins at Moragolla, Sri Lanka

机译:可行性研究在斯里兰卡摩拉哥拉开始

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A feasibility study for the Moragolla hydropower project in Sri Lanka was undertaken in October this year with financial assistance from the Asian Development Bank (ADB). The executing agency, Ceylon Electricity Board, has arranged to implement this work in two phases.The 27 MW project is being planned on the country's longest river, Mahaweli. The project is expected to harness the hydro potential in the river stretch between the existing 201 MW Kotmale dam and its power station outfall.
机译:在亚洲开发银行(ADB)的财政援助下,今年10月对斯里兰卡的Moragolla水电项目进行了可行性研究。执行机构锡兰电力局已安排分两个阶段实施这项工作。该27兆瓦项目正在计划中,该国最长的河流是Mahaweli。预计该项目将利用现有201兆瓦科特马莱大坝与其电站排污口之间河段的水电潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号