Sri Lanka's state power utility, the Ceylon Electricity Board (CEB), invites sealed bids from eligible bidders by 3 April for the engineering, detailed design, manufacture, supply, testing before shipment, installation and commissioning of the mechanical and electrical equipment for the 30 MW Moragolla hydropower project on the river Mahaweli, in the central province. The run-of-river project is planned to comprise a 35 m-high gravity dam, which will impound the river Mahaweli at Weliganga, creating a reservoir with a maximum storage capacity of 1.98 × 10~6 m~3. The powerhouse will be equipped with two Francis turbines with a gross installed capacity of 30 MW, capable of generating average annual output of around 85 GWh. The contract will be financed by the Asian Development Bank, which has provided US$ 113.86 million under the Green Power Development and Energy Efficiency Improvement Investment Programme, Tranche 1. Bids for the main civil works contract, consisting of the construction of the dam, intake, headrace tunnel, surge tank, penstock, powerhouse and tailrace were invited in August 2018 (see H&D Issue 4, 2018).
机译:斯里兰卡的国营电力公司锡兰电力局(CEB)于4月3日之前邀请有资格的投标人进行密封投标,以投标,调试,设计,制造,供应,测试30台机电设备的运输,安装和调试之前中部省份Mahaweli河上的MW Moragolla水电项目。河道上游工程计划包括一个35 m高的重力坝,它将在Weliganga上的Mahaweli河上蓄水,形成一个最大蓄水量为1.98×10〜6 m〜3的水库。该发电站将配备两台弗朗西斯涡轮机,总装机容量为30兆瓦,年平均发电量约为85吉瓦时。该合同将由亚洲开发银行提供资金,该银行已在“绿色电力开发和能源效率改善投资计划”第1批项下提供了1.386亿美元。主要土木工程合同的投标,包括水坝的建设,进水口的建设。 ,2018年8月邀请了头种族隧道,调压罐,压力管道,动力室和尾种族(见《 H&D第4期》)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号