...
【24h】

Pre-Conference Training Seminars

机译:会前培训研讨会

获取原文
获取原文并翻译 | 示例

摘要

Many factors are considered in the design and construction of the optimum hydropower project. All parts of a scheme are interrelated and interdependent. Change one component and all others are affected. This workshop is aimed at people who are, or will be, involved in hydro development as part of rural electrification programmes. It will cover run-of-river hydro projects in the 'pico' to 'mini' range (approximately 1 kW to 1 MW capacity). Being a diverse form of energy production, there are always areas which are unfamiliar to people despite many individual specialisms. This workshop 'fills in the gaps' and helps people to gain a good basic grounding in the topic.
机译:在最佳水电项目的设计和施工中考虑了许多因素。方案的所有部分都是相互关联和相互依存的。更改一个组件,其他所有组件都会受到影响。该讲习班的对象是作为农村电气化计划一部分或将要参与水电开发的人们。它将涵盖“ pico”到“ mini”范围内(约1 kW到1 MW容量)的跨河水电项目。作为多种能源生产形式,尽管有许多个人专长,但总有一些人们不熟悉的领域。该研讨会“填补了空白”,并帮助人们在该主题上获得了良好的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号