Factors influencing the selection of delay analysis methods in construction projects in UAE

机译:影响阿联酋建筑项目延迟分析方法选择的因素

获取原文
获取原文并翻译 | 示例
           

摘要

Several delay analysis methods (DAMs) have been developed and used in the construction industry in order to analyse the causes and effects of delay events. In this research, a number of commonly used DAMs, in the specific context of UAE, are investigated by exploring the factors influencing their selection decisions as well as the process of making such a decision. A total of eight expert respondents from five different projects in the UAE were selected who provided critical insight into the decision-making process adopted in practice to select a DAM. The individual project case analysis as well as the cross case analysis helped to identify a number of factors that influence the selection of DAMs in UAE projects. Some of the main identified factors were the attitude of the client, experience of the delay analyst, reputation and impartiality of the delay analyst, complexity of the project, and cost and timing of performing the analysis. The research argues that such an important decision process that can have a serious impact on the success of a commercial venture requires individual organizations to develop and adopt clear guidelines on how such decisions are made to protect its commercial interests.
机译:在建筑行业开发并使用了几种延迟分析方法(水坝),以分析延迟事件的原因和影响。在这项研究中,通过探索影响其选择决策的因素以及制定这种决定的过程来研究一些常用的大坝。选择了来自阿联酋五个不同项目的八个专家受访者,他们为在实践中采用的决策过程提供了关键洞察力,以选择一个大坝。个人项目案例分析以及跨案例分析有助于确定影响阿联酋项目中大坝的选择的多项因素。一些主要确定的因素是客户的态度,延迟分析师的经验,延迟分析师的声誉和公正性,项目的复杂性以及进行分析的成本和时间。该研究认为,这一重要决策过程可能对商业企业成功产生严重影响,要求各组织制定和采用明确指出,就这些决定如何保护其商业利益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号