New Line, Gauge Conversion, Doubling of Rail Lines and Safety in Rail Operations

机译:新线,轨距换算,铁路线加倍和铁路运营安全

获取原文
获取原文并翻译 | 示例
       

摘要

In the last four years, 2555 km of New Line, 3396 km of Gauge Conversion and 3577 km of Doubling has been commissioned. During 2017-18, 1862 km has been commissioned including 409 km of New Line, 454 km of Gauge Conversion and 999 km of Doubling.Safety is accorded the highest priority by Indian Railways and all possible steps are being undertaken on a continual basis including upgradation of technology to aid safe running of trains. Further, during 2017-18, due to highest pri" ority given to safety works of track renewals and capacity constraints of supply of rails, commissioning of Railway Lines was less.
机译:在过去的四年中,新线2555公里,仪表转换3396公里和加倍3577公里已投入使用。在2017-18年度,共调试了1862公里,包括409公里的新线,454公里的量规转换和999公里的加倍。印度铁路将安全性放在首位,并且所有可能的步骤都在不断地进行,包括升级有助于火车安全运行的技术。此外,在2017-18年度,由于对翻新轨道的安全工作给予最高的重视,以及铁路供应的容量限制,铁路线的启用较少。

著录项

  • 来源
    《Indian Railways》 |2018年第6期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 03:56:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号