首页> 外文期刊>Expert Systems with Application >A hybridization of simulated annealing and electromagnetism-like mechanism for a periodic job shop scheduling problem
【24h】

A hybridization of simulated annealing and electromagnetism-like mechanism for a periodic job shop scheduling problem

机译:模拟退火和类电磁机制的混合求解周期性作业车间调度问题

获取原文
获取原文并翻译 | 示例

摘要

In this paper, we present on a periodic job shop scheduling problem (PJSSP) based on the periodic event scheduling problem (PESP), which is different from cyclic scheduling. The PESP schedules a number of recurring events, such that each pair of events fulfills certain constraints during a given time period. To solve such a hard PJSS problem, we propose a hybrid algorithm, namely EM-SA, which is based on electromagnetism-like mechanism (EM) and simulated annealing (SA). To evaluate this proposed EM-SA, some randomly constructed instances are solved, and the related results are compared with SA and optimum solutions obtained by the branch-and-bound (B&B) algorithm. The results demonstrate the efficiency and effectiveness of the proposed hybrid EM-SA algorithm to solve the PJSSP.
机译:在本文中,我们提出了基于周期性事件调度问题(PESP)的周期性作业车间调度问题(PJSSP),该问题不同于循环调度。 PESP计划许多重复发生的事件,以使每对事件在给定的时间段内满足某些约束条件。为了解决这一难题,我们提出了一种基于电磁机制(EM)和模拟退火(SA)的混合算法,即EM-SA。为了评估该提议的EM-SA,解决了一些随机构造的实例,并将相关结果与SA和通过分支定界(B&B)算法获得的最佳解决方案进行了比较。结果证明了所提出的混合EM-SA算法解决PJSSP的效率和有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号