Project resources scheduling and leveling using Multi-Attribute Decision Models: Models implementation and case study

机译:使用多属性决策模型进行项目资源调度和平衡:模型实现和案例研究

获取原文
获取原文并翻译 | 示例

摘要

Project scheduling is one of the most vital processes in Project Management. It is a widely discussed topic in academic and practical circles due to its importance and complexity. Manpower, machines, materials and equipment are used for the execution of project activities, but these mostly have limited availability, which can constrain project scheduling procedures. Project resources might exceed or fall short of the resource demand in a project's time horizon. These considerations present issues to project managers who must try to properly allocate among these demands in order to achieve a near optimal utilization during a project ' s lifetime. Resource leveling is among the greatest challenges faced by project managers as the success of a project largely depends on it. This is because peaks and valleys in the resource usage histogram are responsible for cost overruns due to the necessary recruitment, dismissal and training of the personnel Moreover, issues may arise regarding the efficient management of available resources given that large peaks correspond to fluctuations in resource allocation during a project ' s life cycle or construction period. To address these issues, resource leveling provides procedures and frameworks that ensure the efficient management of resources to obtain smooth resource usage profiles. These procedures attempt to identify activities that should be delayed to resolve resource over-allocations under time and cost constraints. Given the existence of a variety of available rules that could be followed by project managers to prioritize activities, the paper at hand examines the implementation of five Multi-Attribute Decision Making models and how they perform in the scheduling of a solar park construction project. Namely these models are the Weighted Sum Method, Analytic Hierarchy Process, PROMETHEE, TOPSIS, Ordered Weighted Average (OWA) and Hybrid Weighted Average (HWA). Finally, the derived results are discussed in comparison with those obtained by the standard resource leveling procedures of MS-Project. (C) 2017 Elsevier Ltd. All rights reserved.
机译:项目计划是项目管理中最重要的过程之一。由于其重要性和复杂性,它在学术界和实践界都被广泛讨论。人力,机器,材料和设备被用于执行项目活动,但这些项目大多数都具有有限的可用性,这可能会限制项目计划程序。在项目的时间范围内,项目资源可能超出或低于资源需求。这些考虑因素给项目经理带来了问题,他们必须设法在这些需求之间进行适当分配,以便在项目生命周期内实现接近最佳的利用率。资源均衡是项目经理面临的最大挑战之一,因为项目的成功很大程度上取决于它。这是因为资源使用直方图中的高峰和低谷是由于人员的必要招募,解雇和培训而造成的成本超支。此外,鉴于大的高峰对应于资源分配的波动,可能会出现有关可用资源的有效管理的问题在项目的生命周期或施工期间。为了解决这些问题,资源平衡提供了过程和框架,可确保对资源进行有效管理以获取平稳的资源使用情况。这些过程试图确定在时间和成本约束下应延迟解决资源过度分配的活动。鉴于存在各种可用规则,项目经理可以遵循这些规则来确定活动的优先级,因此本文研究了五个多属性决策模型的实现以及它们在太阳能公园建设项目的调度中的执行情况。即,这些模型是加权和方法,层次分析过程,PROMETHEE,TOPSIS,有序加权平均值(OWA)和混合加权平均值(HWA)。最后,将所得结果与通过MS-Project的标准资源平衡过程获得的结果进行比较。 (C)2017 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号