First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure

机译:资源受限项目调度与项目结构模型 - 内遗工决策的首先结果

获取原文

摘要

1 Introduction In the classical resource-constrained project scheduling problem (RCPSP, cf., e.g., [2]) the project structure is given exogenously, i.e. all jobs have to be implemented. In this paper, the RCPSP is extended by a model-endogenous decision on the project structure in order to include alternative modalities which activate specific jobs and precedence relations.
机译:1在经典资源约束的项目调度问题中引入(RCPSP,CF.,例如,[2])项目结构是外源给出的,即必须实施所有工作。在本文中,RCPSP通过对项目结构的模型 - 内源决策延伸,以包括激活特定工作和优先关系的替代模式。