首页> 外文期刊>Environmental Management >Environmental Impact Assessment and Environmental Audit in Large-Scale Public Infrastructure Construction: The Case of the Qinghai-Tibet Railway
【24h】

Environmental Impact Assessment and Environmental Audit in Large-Scale Public Infrastructure Construction: The Case of the Qinghai-Tibet Railway

机译:大型公共基础设施建设中的环境影响评价与环境审计-以青藏铁路为例

获取原文
获取原文并翻译 | 示例
       

摘要

Large-scale public infrastructure projects have featured in China's modernization course since the early 1980s. During the early stages of China's rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai-Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway's construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.
机译:自1980年代初以来,大规模的公共基础设施项目已成为中国现代化进程的特色。在中国经济快速发展的初期,公众的注意力集中在高调建设项目的经济和社会影响上。但是,近年来,我们已经看到公众对此类项目的环境和生态影响的关注,如今,要求政府在允许大规模建设之前提供有效的环境影响评估。官方对环境条件进行监控的要求导致近年来有关环境影响评估(EIA)和政府环境审计(GEA)作为大规模建设实例中的环境保障措施的有效性的辩论越来越多。尽管EIA和GEA是由不同的机构进行的,具有不同的目标和执行潜力,但是这两种方法在方法上可以紧密相关。本文以青藏铁路的建设为例,在此实例中,EIA和GEA提供了环境影响管理的补充方法。这项研究得出的结论是,GEA方法可以作为EIA的有效后续措施,并确定EIA为开展未来的GEA打下基础。通过对铁路建设的研究得出的关系要求,如果要把两种做法结合起来以达到最佳效果,则需要进行更深思熟虑的制度安排和合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号