首页> 外文期刊>Engineering news-record >Corps of Engineers Chief Calls Iraq Rebuild 'On-Plan'
【24h】

Corps of Engineers Chief Calls Iraq Rebuild 'On-Plan'

机译:工兵长官呼吁伊拉克重建“按计划”

获取原文
获取原文并翻译 | 示例
       

摘要

By year's end, more than 3,000 projects worth $11.2 billion will have been launched for Iraq's reconstruction. All but 300, worth about $2.8 billion, will be completed by then, says Lt. Gen. Carl A. Strock, chief of the U.S. Army Corps of Engineers. "We're really on-plan," Strock told ENR editors in a briefing July 7. "By December everything will be under way." Strock recently returned from Iraq and Afghanistan, where he officiated over the Gulf Regional Division change of command. GRD covers Afghanistan and Iraq. Brig. Gen. William McCoy took over on June 26, replacing Brig. Gen.
机译:到年底,将启动价值112亿美元的3,000多个项目,用于伊拉克的重建。美国陆军工程兵团团长卡尔·斯特罗克中将说,除300座外,其余全部价值约28亿美元。 “我们真的在计划中,”斯特罗克在7月7日的简报中对ENR编辑说。“到12月,一切都会进行。”斯特罗克最近从伊拉克和阿富汗返回,负责海湾地区司的指挥变更。 GRD覆盖阿富汗和伊拉克。双桅船威廉·麦考伊(William McCoy)将军于6月26日接任,接替了布里格(Brig)。 。

著录项

  • 来源
    《Engineering news-record》 |2005年第3期|p.13|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:16:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号