首页> 外文期刊>Engineering news-record >Rural Alaskan Communities Are Becoming Empowered
【24h】

Rural Alaskan Communities Are Becoming Empowered

机译:阿拉斯加农村社区正变得有能力

获取原文
获取原文并翻译 | 示例
       

摘要

Isolated communities in southeast Alaska's rugged, fjord-punctuated panhandle have moved a step closer to being plugged into a regional electricity grid with the completion of the first of eight electricity transmission projects last month. But costly missing links may still take years to complete. Moving at a glacial pace, the $341-million program was first envisioned 20 years ago and is scheduled to be completed after 2030. About 20 communities will be connected over the next 20 to 30 years, under plans prepared in 2003 by D. Hittle & Associates Inc., Ken-newick, Wash., for The Southeast Conference, Juneau, the region's economic development association.
机译:上个月完成了八个输电项目中的第一个,阿拉斯加东南部崎不平,峡湾穿插的狭长把手使偏僻的社区向区域电网插电迈进了一步。但是,代价高昂的缺失链接可能仍需要数年才能完成。这项计划耗资3.41亿美元,以冰河般的步伐向前迈进,始于20年前,计划于2030年后完成。根据D.Hittle&D. Hittle&Co在2003年制定的计划,未来20至30年内将有大约20个社区建立联系。华盛顿州肯尼维克市的联合公司,参加该地区经济发展协会朱诺市的东南会议。

著录项

  • 来源
    《Engineering news-record》 |2006年第23期|p.15|共1页
  • 作者

    Weld Royal;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:16:34

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号