【24h】

People

机译:

获取原文
获取原文并翻译 | 示例
       

摘要

Bechtel National Inc. has named Margaret "Peggy" McCullough as project director for the estimated $12.2-billion nuclear-waste vitrification project at the U.S. Energy Dept.'s Hanford site in Washington state. A principal vice president, she replaces Frank Russo, who is taking on a new assignment for Bechtel in the U.K. Bechtel did not disclose its scope. McCullough was Bechtel project director of the Daunia coking-coal project in Queensland that was developed by Australia BHP Billiton and Mitsubishi Alliance. The $1.5-billion project is set for full production in 2014. She also was deputy general manager of Bechtel SAIC, the management-operations contractor for DOE's Yucca Mountain, Nev., nuclear-waste repository project. Bechtel is designing and building and will commission the Hanford plant, which will be the world's largest radioactive-waste treatment facility when completed, it says. Energy Secretary Ernest Moniz is set to announce, by the fall, a plan to address design issues that have slowed construction, says a published report in Washington state.
机译:Bechtel National Inc.已任命Margaret“ Peggy” McCullough为项目负责人,该项目是美国能源部位于华盛顿州汉福德基地的估计价值122亿美元的核废料玻璃化项目。她担任首席副总裁一职,接替了正在为英国Bechtel接任新职务的FrankRusso。Bechtel没有透露其业务范围。 McCullough曾是澳大利亚BHP Billiton和三菱联盟开发的昆士兰州Daunia焦煤项目的Bechtel项目总监。这个耗资15亿美元的项目计划于2014年全面投产。她还曾担任美国能源部内华达州尤卡山核废料处置库项目管理运营承包商Bechtel SAIC的副总经理。贝克特尔公司正在设计和建造中,并将委托汉福德工厂投入使用。汉福德工厂建成后将成为世界上最大的放射性废物处理设施。华盛顿州的一份发表的报告说,能源部长欧内斯特·莫尼兹(Ernest Moniz)将于秋天宣布一项解决设计问题的计划,该设计问题已经拖延了建筑的进度。

著录项

  • 来源
    《Engineering news-record》 |2013年第2期|25-25|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:12:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号