A REGULAR SERIES ON DEVELOPMENTS IN THE LAW AND HOW THEY AFFECT MANAGERS

机译:有关法律发展的规律系列及其影响力管理者

获取原文
获取原文并翻译 | 示例
       

摘要

Arbitrators dealing with engineering project disputes regularly encounter so-called 'global claims'. These are claims by contractors, alleging delay and disruption, where the Claimant cannot disentangle a host of events which have caused him to remain on site longer than expected and have made his work more onerous. Such composite claims have been a frequent feature of arbitrations since the case of Crosby Ltd v Portland UDC (1967) 5 Building Law Reports 121. In that case the highly-regarded judge, Donaldson J. (later Lord Donaldson) approved a lump sum award by an arbitrator in respect of a collection of claims. The judge said the contractor had incurred extra cost because of an extremely complex interaction between the consequences of various site events, and it was difficult or even impossible to make an accurate apportionment between the various causes.
机译:处理工程项目纠纷的仲裁员经常会遇到所谓的“全球索赔”。这些是承包商的索赔,指称延误和中断,索赔人无法解开许多事件,这些事件导致他在现场停留的时间比预期的长,并使他的工作更加繁重。自从Crosby Ltd诉Portland UDC(1967)5 Building Law Reports 121一案以来,此类综合性索赔便成为仲裁的常见特征。在该案中,备受推崇的法官Donaldson J.(后来的Donaldson勋爵)批准了一次性赔偿金。由仲裁员就索偿而定。法官说,由于各种现场事件的后果之间极其复杂的相互作用,承包商付出了额外的费用,而且很难甚至不可能在各种原因之间进行准确的分配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号