首页> 外文期刊>Engineering Management Journal >A REGULAR SERIES ON DEVELOPMENTS IN THE LAW AND HOW THEY AFFECT MANAGERS
【24h】

A REGULAR SERIES ON DEVELOPMENTS IN THE LAW AND HOW THEY AFFECT MANAGERS

机译:有关法律发展的规律系列及其影响力管理者

获取原文
获取原文并翻译 | 示例
       

摘要

As a result of the 1996 Arbitration Act, the 1996 Construction Act, CIMAR, the CPR and the various ADR procedures now available, parties should take a much more sophisticated approach to dispute resolution than hitherto. This means taking care to ensure that the contracts they enter into have multi-layered dispute resolution clauses, providing for, for example, mediation (and expert determination in respect of purely technical disputes), followed by arbitration, and bearing in mind that adjudication is always available to those involved in a construction contract. It is generally sensible to include an agreement, within the contract, that in any arbitration the CIMAR are to apply.
机译:作为1996年仲裁法,1996年建筑法,CIMAR,CPR和现在可用的各种ADR程序的结果,与以往相比,当事方应采取更为复杂的方法来解决争端。这意味着要谨慎确保所签订的合同具有多层的争议解决条款,例如规定进行调解(和纯技术性争议的专家裁定),然后进行仲裁,并牢记裁决是始终对参与施工合同的人员可用。通常明智的做法是在合同中包含一项协议,以在CIMAR的任何仲裁中适用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号