...
首页> 外文期刊>Energy >Performance effects of combined cycle power plant with variable condenser pressure and loading
【24h】

Performance effects of combined cycle power plant with variable condenser pressure and loading

机译:可变冷凝器压力和负荷的联合循环电厂的性能影响

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Utility power producers are being driven by the inherently high efficiency and attractive installed cost of Combined Cycle Power Plants (CCPP) to consider them as the dominant choice for least-cost power. However, in a CCPP the power capability is significantly affected by the ambient temperature [Sue DC, Chuang CC, Lin PH. Performance improvement for gas turbine combined cycle power plants (GTCCPP) in Taiwan. In: Johnson D, editor. Electric power. Fourth annual conference and exhibition, vol. 4A; 2004. St Louis, MI, USA: American Center, p. 1-15. [1]], condenser pressure and power demand. In the Power Purchase Agreements (PPA) written in Taiwan, the capacity payment is based on the guaranteed power output during the operating period. Therefore, operating the CCPP at the highest performance and maintaining the guaranteed or contractual power output are important factors to get the full capacity and energy payments from the power purchaser and reduce the fuel and operating costs for the power producer.
机译:联合循环发电厂(CCPP)固有的高效率和有吸引力的安装成本正推动着公用电力生产商将其视为成本最低的电力的主要选择。但是,在CCPP中,功率能力会受到环境温度的显着影响[Sue DC,Chuang CC,Lin PH。台湾燃气轮机联合循环发电厂(GTCCPP)的性能改进。在:约翰逊D,编辑。电力。第四届年度会议和展览,第一卷。 4A; 2004年。美国密歇根州圣路易斯:美国中心,第3页。 1-15。 [1],冷凝器压力和功率需求。在台湾签订的《电力购买协议》(PPA)中,容量付款基于运营期间的保证电力输出。因此,以最高性能运行CCPP并保持有保证的或合同的功率输出是重要的因素,可从购电方获得全部容量和能源支付,并减少发电商的燃料和运营成本。

著录项

  • 来源
    《Energy》 |2005年第10期|p.1793-1801|共9页
  • 作者单位

    Institute of Mechanical and Electrical Engineering, National Taipei University of Technology, Taipei, Taiwan, ROC;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 能源与动力工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号