首页> 外文期刊>Energy for sustainable development >Renewable energy contingencies in power systems: Concept and case study
【24h】

Renewable energy contingencies in power systems: Concept and case study

机译:电力系统可再生能源突发事件:概念和案例研究

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a cooptimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources. (C) 2019 International Energy Initiative. Published by Elsevier Inc. All rights reserved.
机译:本文介绍了可再生能源突发事件的概念,代表可变可再生能源(VRE)资源的长期/扩展可变性,即低风/太阳可用性的重要时期(例如,天/周)。这些突发事件迄今没有得到很多关注,但可能会成为印度等一些国家的主要问题,因为v份的份额增加。使用38年的气候模型重新分析数据对于印度的风力,我们证明了低于长期(印度)全国平均5米/秒的风差的低期间可以在几个区域部署的几个区域中延长100多天大风电场。即使在印度的一些最佳风力资源区域,长期平均风速接近7米/秒,风天低风日(例如,5米/秒,大幅低于平均值)可延长60天。我们提出了一项四步方法,围绕基于高化的能源 - 辅助服务调度模型,以评估可再生应急性的影响,并为泰米尔纳德邦的国家,这是印度最富裕的富国状态的影响。我们估计,泰米尔纳德邦的5 GW额外风的年度可再生应力成本影响为27-76亿美元。规划分析应采用可再生应急的概念来认识到这些成本,并制定必要的纺纱储备和备用生成资源。 (c)2019年国际能源倡议。由elsevier Inc.出版的所有权利保留。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号