...
首页> 外文期刊>Energy Exploration & Exploitation >Economic assessment of water pumping systems using wind energy conversion systems in the southern part of Nigeria
【24h】

Economic assessment of water pumping systems using wind energy conversion systems in the southern part of Nigeria

机译:尼日利亚南部使用风能转换系统的抽水系统的经济评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study assessed the wind energy potential and the economic viability of the water pumping systems supplied by various wind turbine models. The two-parameter Weibull probability density function was employed to analyze the wind speed data collected between 1971 and 2007 by the Nigerian Meteorological Agency for seven meteorological stations, in the southern part of Nigeria, namely Asaba, Calabar, Ogoja, P-Harcourt, Uyo, Benin-City, and Warri. The performance of small to medium size commercial wind turbine models of various rated powers ranging from 5.2 kW to 250 kW were investigated and economic evaluation of the wind energy in all the sites was performed using the levelised cost method. The results showed that the annual mean wind speeds range from 3.09 m/s at Warri to 4.15 m/s at Calabar, while the corresponding annual mean power densities vary from 23.17 W/m~2 to 56.22 W/m~2. Our analysis demonstrated that the wind resource in all the sites considered fall into Class 1 wind resource category, hence, they can marginally be considered for small scale standalone system for electricity generation. The cost of energy production per kWh for the selected sites varies between $0,090 at Ogoja and $2.118 at Uyo. Moreover, the cost of water delivered varies from $3.33 per cubic metres in Calabar to $54.96 per cubic metres in Uyo.
机译:这项研究评估了各种风力涡轮机模型提供的风能潜力和水泵系统的经济可行性。利用两参数威布尔概率密度函数分析了尼日利亚气象局在尼日利亚南部Asaba,Calabar,Ogoja,P-Harcourt,Uyo的七个气象站在1971年至2007年之间收集的风速数据。 ,贝宁城和沃里。研究了额定功率从5.2 kW到250 kW的中小型商业风力涡轮机模型的性能,并使用分层成本法对所有场所的风能进行了经济评估。结果表明,年平均风速在Warri处为3.09 m / s,在Calabar为4.15 m / s,而相应的年平均功率密度在23.17 W / m〜2至56.22 W / m〜2之间。我们的分析表明,所有考虑的站点中的风资源都属于1类风资源类别,因此,对于小型独立发电系统,可以略微考虑它们。选定地点的每千瓦时能源生产成本在Ogoja为$ 0,090至Uyo为$ 2.118之间。此外,供水成本从卡拉巴尔的每立方米3.33美元到乌约的每立方米54.96美元不等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号