首页> 外文OA文献 >Assessment of electricity generation and energy cost of wind energy conversion systems in north-central Nigeria
【2h】

Assessment of electricity generation and energy cost of wind energy conversion systems in north-central Nigeria

机译:尼日利亚中北部评估风力发电系统的发电和能源成本

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In this study, the wind energy potential and economic analysis in selected six locations in north centraludpart of Nigeria were investigated using wind speed data that span between 19 and 37 years measured atud10 m height. The performance of small to medium size commercial wind turbine models were examinedudand economic evaluation of the wind energy in the selected sites was made by using the levelised costudmethod. The results showed that the cost of energy production per kWh for the selected sites varyudbetween ¢4.02 and ¢166.79. It was shown that Minna is most viable site while Bida is found to be leastudamong the sites considered. Using three selected wind turbine models (in Minna) as case study, anudincrease in the escalation rate of operating and maintenance cost from 0% to 10%, lead to an increaseudin the unit energy cost by about 7%. It was further shown that by increasing the escalation rate of inflationudfrom 0% to 5%, the cost of energy decreases by about 29% while the discount rate (return on investment)uddecreases from 11.54% to 6.23%.
机译:在这项研究中,使用19到37年之间的风速数据(在ud10 m高度测量),对尼日利亚北部中部北部的选定六个位置的风能潜力和经济分析进行了调查。检验了中小型商业风力涡轮机模型的性能,并通过使用均衡的成本/方法对选定地点的风能进行了经济评估。结果表明,所选站点的每千瓦时能源生产成本在24.02和166166.79之间变化。结果表明,Minna是最可行的站点,而Bida被认为是最不可行的站点。使用三个选定的风力涡轮机模型(在Minna进行案例研究),运行和维护成本的提升率从0%增加到10%,导致单位能源成本增加了大约7%。进一步表明,通过将通货膨胀率从0%提高到5%,能源成本降低了约29%,而折现率(投资回报率)从11.54%降低到了6.23%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号