Structure of realised risks of projects for construction nuclear power plant by Rosatom State Corporation in 2010-2020

机译:2010 - 2010 - 2020年ROSATOM国家公司建筑核电站项目的实现风险的结构

获取原文
       

摘要

Rosatom State Corporation is one of the world leaders in the construction of nuclear power plant (NPP), keeping a ten-year portfolio of foreign orders at the level of 140 billion $. Taking into account the long period of construction nuclear power plant, significant amount of capital investment, significant number of participants investment-construction project, critically important for constructer organizer to identify and consider possible risks of project implementation in time, developing and improving its management mechanisms. As a part of research risk analysis and systematization was performed, realized in the construction of nuclear power plants by domestic specialist in 2008-2020 (Novovoronezh NPP-2, Rostov NPP, Kursk NPP-2, Belarussian NPP, NPP Kudankulm, NPP El-Dabaa, NPP Akkuyu, NPP Rooppur, NPP Paksh-2). Based on the analysis formed 8 risk families, determined shares of these groups in general registry. The revealed structure of realized risks demonstrates, that the largest share in general registry is made up of technical and organizational risks, which are systematically given insufficient attention by researches and construction organizers. Conducted research also allows us to draw a conclusion about the most common risk concerning late detection of complex conditions of the object placement site, which was implemented in five projects out of nine considered. The results of the accomplished research can be used in the development of modern nuclear power plant construction projects in Russia and abroad, which will have a positive impact on the competitiveness of domestic projects in the global nuclear power plant market and increase their profitability. The experience of nuclear power in terms of risk management can become a driver for full-scale improvement of organizational and technological approaches in the construction of unique buildings and structures in the future.
机译:Rosatom State Corporation是核电站建设核电站(NPP)的世界领导者之一,在1400亿美元的价格下保持十年的外国订单组合。考虑到长期建设核电站,大量资本投资,大量与会者投资 - 建设项目,对建筑机构的批判性重要性,识别和考虑在时间,发展和改善其管理机制的可能性。 。作为研究风险分析和系统化的一部分,在2008 - 2012年通过国内专家建造核电站(Novovoronezh NPP-2,Rostov NPP,Kursk NPP-2,Belarussian NPP,NPP Kudankulm,NPP El- DABAA,NPP AKKUYU,NPP罗波尔,NPP PAKSH-2)。基于分析,成立了8个风险家庭,在一般登记处确定了这些群体的股份。揭示了实现风险的结构表明,普通登记处的最大份额由技术和组织风险组成,这些风险由研究和建筑组织者系统地提供了不足的关注。进行的研究还允许我们得出关于最常见的有关对象放置部位的复杂条件的最常见风险的结论,这在九个考虑中实施了五个项目。完成研究的结果可用于俄罗斯和国外现代核电站建设项目的发展,这将对全球核电站市场的国内项目竞争力产生积极影响,并提高盈利能力。风险管理方面的核电经验可以成为在未来建造独特建筑和结构的组织和技术方法的全面改善的驾驶员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号