Report on neri research project to reduce capital costs and plant construction time for future nuclear power plants

机译:关于减少未来核电厂的资本成本和工厂建设时间的neri研究项目的报告

获取原文

摘要

This paper describes the major goals, objectives and the research plan that a combined team of industry, university, and national laboratory personnel will be pursuing to achieve substantial reductions in the capital cost and overall delivery time for new nuclear power plants. The project team, led by Duk eEngineering & Services (DE&S) and in collaboration with Sandia National Laboratory (SNL), ABB-Combustion Engineering Nuclear Power (ABB-CENP), the Massachusetts INstitute of Technology (MIT) and the North Carolina State University (NCSU) have proposed to pursue the development of innovative technologies to reduce design, fabrication and construction costs for future nuclear plants. The research has been sponsored by the Department of Energy with a three-year duration that commenced in September of 1999. Due to the timing of this research coupled with the ICONE-8 Conforence, the paper will focus on the areas for investigation and research methodologies being employed.
机译:本文描述了由工业界,大学和国家实验室人员组成的团队追求的主要目标,目的和研究计划,以实现大幅减少新核电站的资本成本和总体交付时间。该项目团队由Duk eEngineering&Services(DE&S)领导,并与Sandia国家实验室(SNL),ABB燃烧工程核能(ABB-CENP),麻省理工学院(MIT)和北卡罗来纳州立大学合作(NCSU)已提议继续开发创新技术,以减少未来核电站的设计,制造和建造成本。这项研究由能源部赞助,为期三年,从1999年9月开始。由于这项研究的时机以及ICONE-8 Conforence,本文将重点研究领域和研究方法被雇用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号