首页> 外文期刊>Data in Brief >Monitored deformation data during the construction of an urban subway
【24h】

Monitored deformation data during the construction of an urban subway

机译:在城市地铁建造期间监测变形数据

获取原文
       

摘要

The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and it included monitoring points for ground subsidence, building settlement, vault deformation and the tunnel horizontal deformation. The deformation data in this article was measured using surveying in the site and it can be reused to validate numerical simulation results and guide the similar engineering project in the nearby area.
机译:该数据集与四个月内重庆地铁9号线建造期间的地面和结构变形有关。隧道采用钻孔和爆破方法以及隧道镗床(TBM)构建。在该网站中设定了系统监控系统,包括地面沉降,建筑沉降,拱顶变形和隧道水平变形的监测点。本文中的变形数据在现场进行测量测量,可以重复使用以验证数值模拟结果并指导附近地区的类似工程项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号