The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and it included monitoring points for ground subsidence, building settlement, vault deformation and the tunnel horizontal deformation. The deformation data in this article was measured using surveying in the site and it can be reused to validate numerical simulation results and guide the similar engineering project in the nearby area.
机译:该数据集与重庆地铁9号线四个月的建设过程中的地面和结构变形有关。该隧道是使用钻孔爆破方法以及隧道掘进机(TBM)建造的。在现场设置了一个系统的监测系统,它包括地面沉降,建筑物沉降,拱顶变形和隧道水平变形的监测点。本文中的变形数据是通过现场测量来测量的,可以将其重新用于验证数值模拟结果并指导附近地区的类似工程项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号