Allocation of logistic risk-investment in public-private-partnership – use of fuzzy TOPSIS method

机译:公共-私人伙伴关系中的后勤风险投资分配–模糊TOPSIS方法的使用

获取原文
       

摘要

Appropriate risk assessment related to the project, and then its distribution between partners is the core of cooperation in the framework of public-private partnership (PPP). Risk analysis for investment project in the PPP formula includes: preliminary identification of risks associated with the investment, preliminary assessment and forecast of probability of occurrence of risks in the recommended option of investment implementation, initial analysis of the distribution of risks between a public and private entity depending on the legal and organizational model adopted, including the determination of the appropriate separation between the parties to the contract. The article presents the possibility of using multicriteria methods, in particular fuzzy TOPSIS, for risk assessment and selection of the best contractor for a given project under PPP.
机译:与项目相关的适当风险评估,然后在合作伙伴之间进行风险分配,是公私合作伙伴关系(PPP)框架下合作的核心。购买力平价公式中的投资项目风险分析包括:与投资有关的风险的初步识别,建议投资实施方案中风险发生概率的初步评估和预测,公私之间风险分布的初步分析实体取决于采用的法律和组织模型,包括确定合同各方之间适当的分离。本文介绍了使用多准则方法(尤其是模糊TOPSIS)进行风险评估和为PPP下给定项目选择最佳承包商的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号