首页> 外文期刊>MATEC Web of Conferences >Defects of the building and its remediation – Case study: Elementary school Vodňany
【24h】

Defects of the building and its remediation – Case study: Elementary school Vodňany

机译:建筑物的缺陷及其修复–案例研究:小学Vodňany

获取原文
           

摘要

The aim of the paper is to provide information on the defects in the construction of the elementary school in Vodňany. The building of the elementary school dates back to 1973. It is a reinforced concrete columns skeleton with a filling peripheral and internal dividing brick masonry. The object is used by the primary school and is permanently used and maintained. The extent of structural damage is stabilized in the current state and is not an immediate risk to the user of the object. It concerns only non-load-bearing structures (floor and partitions), the vertical load-bearing structures do not show a decrease and therefore the stability of the whole building is not compromised. However, actual damage complicates operation of elementary school and is very non-aesthetic. Concurrent damage to structures is the result of vertical deformation of the foundation soil. Vertical deformation of the foundation soil - sediment is the result of the building construction on a former creek which was not properly excavated and covered with a suitable backfill. Subsidence further strengthens imperfect drained rainwater from the roof of the building and leakage of rainwater drains.
机译:本文的目的是提供有关伏达尼小学建设中的缺陷的信息。这座小学的建筑可以追溯到1973年。它是钢筋混凝土圆柱骨架,周围填充有内部砖砌体。该对象由小学使用,并且是永久使用和维护的。结构损坏的程度在当前状态下稳定,并且对对象的使用者不是直接的风险。它仅涉及非承重结构(地板和隔板),垂直承重结构没有减少,因此不会损害整个建筑物的稳定性。然而,实际的损坏使小学的操作复杂化,并且是非常不美观的。对结构的同时损坏是基础土壤垂直变形的结果。基础土壤-沉积物的垂直变形是由于建筑结构是在前一条小溪上造成的,该小溪未正确开挖并覆盖有合适的回填物。沉降进一步加强了建筑物屋顶排出的不完善雨水和雨水排水口的泄漏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号