首页> 外文期刊>Consulting-specifying engineer >Elevating Emergency Power Requirements for Elevators
【24h】

Elevating Emergency Power Requirements for Elevators

机译:提升电梯的应急电源要求

获取原文
获取原文并翻译 | 示例

摘要

The International Building Code (IBC) was adopted last year in the state of Washington. Starting July 1, 2004, all projects obtaining building permits are required to follow the IBC. Prior to July 1, 2004, all projects followed the Uniform Building Code (UBC). Many items in the IBC that are different from the UBC can affect the electrical distribution systems in commercial buildings. One such issue is that in buildings of four or more stories, the IBC requires the elevator to be part of the standby power system. As a result many new projects will now potentially require a standby generator.
机译:去年,华盛顿州通过了《国际建筑规范》(IBC)。从2004年7月1日开始,所有获得建筑许可证的项目都必须遵守IBC。在2004年7月1日之前,所有项目均遵循统一建筑规范(UBC)。 IBC中与UBC不同的许多项目会影响商业建筑中的配电系统。这样的问题之一是,在四层或更多层的建筑物中,IBC要求电梯成为备用电源系统的一部分。结果,许多新项目现在可能需要备用发电机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号