首页> 外文期刊>Construction equipment >Budgets Limping Along
【24h】

Budgets Limping Along

机译:预算紧缺

获取原文
获取原文并翻译 | 示例
       

摘要

Look no further than the blue map at the right to see that government fleets experienced a second straight year of funding decreases in 2004. For some regions, it was the third year in a row that money has dried up. The positive side, if it can be called such, is that the net (the percent reporting increases minus the percent reporting decreases) was slightly higher for local fleets than forecast for the year. Among local fleets, 17 percent reported funding increases minus 33 percent reporting decreases for a net of-16. On the state side, 20 percent reported increases minus 37 percent decreases for a net of-17.
机译:从右边的蓝图可以看出,2004年政府机队的资金连续第二年减少。在某些地区,这是资金连续第三年枯竭。如果可以这样说,积极的一面是,本地机队的净额(报告百分比增长减去报告减少百分比)略高于当年的预测。在当地机队中,报告的资金增加了17%,报告的减少了33%,净减少了16。在美国方面,报告的增长为20%,下降为37%,净值为17。

著录项

  • 来源
    《Construction equipment》 |2005年第1期|p.A15-A16|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑施工机械和设备;建筑施工;
  • 关键词

  • 入库时间 2022-08-18 00:01:43

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号