首页> 外文期刊>Concrete >Concrete progress as Chinese dam construction continues apace
【24h】

Concrete progress as Chinese dam construction continues apace

机译:随着中国大坝建设的不断推进,混凝土进展

获取原文
获取原文并翻译 | 示例
           

摘要

Since April 2009, construction teams from SinoHydro and CGGC have been hard at work constructing two 6930MW underground power stations on each side of the Jinsha River (further downstream, at a confluence with the Min River, it becomes the Yangtze River).rnIn order to capture sufficient water to feed what will become the world's second-largest hydropower project, a 285m-high double-curvature thin arch dam is being constructed. Other major appurtenant works include a tail-water dam with a large tail-pond, 18 tailraces, which will eventually converge, linking up with six 14m-wide, 19m-high river diversion tunnels.
机译:自2009年4月以来,来自中国水利水电建设集团和中国重汽集团的建设团队一直在努力工作,在金沙江两岸建设两座6930兆瓦地下电站(更下游,与Min河汇合,成为长江)。为了获取足够的水以供养,这将成为世界第二大水电项目,一个285m高的双曲率薄拱坝正在建设中。其他主要的附属工程包括一个带大尾池的尾水坝,18个尾水渠,这些水坝最终将汇聚在一起,并与6条14m宽,19m高的引水隧道连接。

著录项

  • 来源
    《Concrete》 |2010年第8期|P.31-33|共3页
  • 作者

    Li Wenwei;

  • 作者单位

    China Three Gorges Project Corporation and Paul Snook, MWH Global;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号