...
首页> 外文期刊>Betonwerk + Fertigteil-Technik >Y-shaped precast columns contribute to construction progress of terminal 3
【24h】

Y-shaped precast columns contribute to construction progress of terminal 3

机译:Y形预制柱有助于终端3的施工进度

获取原文
获取原文并翻译 | 示例
           

摘要

The overall project of implementing the new construction of terminal 3 is running at full speed. J-Pier, the largest passenger gate of the project, is also growing bit by bit. On the eastern plot of the former Rhein-Main Air Base the new terminal 3 is being built for up to 25 million passengers per year. Some 50 airplane parking lots are provided there. In the complete layout, the new terminal will consist of the four passenger areas G, H, J and K, with Anton Schick GmbH + Co. KG as part of the Schick Group being responsible for the construction of the H and J piers as well as the roughly 70m-tall tower.
机译:实施终端3的新建的整体项目以全速运行。 j-pier是该项目最大的乘客门,也逐步增长。在前莱茵 - 主空中的东部地块上,新航站楼每年建造高达2500万乘客。有大约50个飞机停车场。在完整的布局中,新终端将由四个乘客区G,H,J和K包括Anton Schick GmbH + Co.KG作为Schick集团的一部分,负责H和J码头的构建作为大约70米高的塔楼。

著录项

  • 来源
    《Betonwerk + Fertigteil-Technik》 |2021年第1期|20-21|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号