首页> 外文期刊>Communications in numerical methods in engineering >Analysis of coupled seepage and stress fields in rock mass around the Xiaowan arch dam
【24h】

Analysis of coupled seepage and stress fields in rock mass around the Xiaowan arch dam

机译:小湾拱坝围岩渗流场与应力场耦合分析。

获取原文
获取原文并翻译 | 示例

摘要

The Xiaowan arch dam, with a maximum height of 292 m, is located across the Lancangjiang River in Yunnan Province of China, and once completed will be the highest arch dam in China. Because of the high water head and the arch action, it is necessary to analyse the interaction between seepage and stress fields in rock mass around the Xiaowan arch dam. Numerical solution of coupled seepage and stress fields in rock mass around the Xiaowan arch dam is analysed by means of the multi-level fracture network model and the finite element method. It can be shown from the computation results that storage of the reservoir makes the seepage field change much, and makes the effective vertical stress in rock foundation near the dam and the tensile stress in the abutment rock mass increase, and that the coupled action between seepage and stress fields should be taken into account.
机译:小湾拱坝最大高度为292 m,位于中国云南省澜沧江对岸,建成后将成为中国最高的拱坝。由于高水头和拱作用,有必要分析小湾拱坝周围岩体的渗流与应力场之间的相互作用。利用多级裂隙网络模型和有限元方法,对小湾拱坝周围岩体中渗流场与应力场的耦合问题进行了数值求解。从计算结果可以看出,储层的存储使渗流场发生了很大变化,使大坝附近岩石基础中的有效竖向应力和桥台岩体中的拉应力增大,并且渗流之间的耦合作用。并且应考虑应力场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号