首页> 外文期刊>Civil Engineering >Ford's Theatre Rehabilitation Strengthens, Modernizes Historic Site
【24h】

Ford's Theatre Rehabilitation Strengthens, Modernizes Historic Site

机译:福特剧院修复工作得到加强,对历史遗址进行现代化改造

获取原文
获取原文并翻译 | 示例
           

摘要

A17-monthlong rehabilita-tion of the Ford's Theatre Na-tional Historic Site-four adjoining buildings in Washington, D.C., the most famous being the theater in which President Abraham Lincoln was assassinated in April 1865-included strengthening the foundations of these 19th-century structures, adding an elevator to the complex for the first time, and installing new structural supports for the improved mechanical systems in the theater's attic and for a modern stage rigging system for theatrical productions. The $13.5-million project was completed in February, in time for the theater to reopen for the bicentennial celebration of Lincoln's birth. The theater had been closed since August 2007 for the rehabilitation.
机译:福特剧院国家历史遗迹的整修历时17个月,位于华盛顿特区的四座毗连建筑物,其中最著名的是1865年4月亚伯拉罕·林肯总统被暗杀的剧院,其中包括巩固了19世纪的基础的结构,这是首次在综合大楼中增加一部电梯,并为剧院阁楼中改进的机械系统以及用于戏剧制作的现代舞台索具系统安装了新的结构支撑。这个耗资1,350万美元的项目于2月完成,正好赶上剧院重新开放,以纪念林肯诞辰200周年。自2007年8月以来,剧院已关闭以进行修复。

著录项

  • 来源
    《Civil Engineering》 |2009年第7期|18-21|共4页
  • 作者

    Robert l. Reid;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号