首页> 外文期刊>Building >CASE STUDY: SPEED IS KEY FOR RETIREMENT VILLAGE
【24h】

CASE STUDY: SPEED IS KEY FOR RETIREMENT VILLAGE

机译:案例研究:速度是退休村的关键

获取原文
获取原文并翻译 | 示例
       

摘要

The ExtraCare retirement village in Shenley Wood, Milton Keynes will be the fourth project on which Willmott Dixon Homes has used the KBS, with Kingspan designing, manufacturing and installing the steel frame, insulated wall panels and floor cassettes. Designed by architect Nicol Thomas, phase one of the scheme comprises 184 apartments in two blocks and a one-storey community building, which will include a gym, IT suite, woodwork shop and winter garden. Kingspan is building the first of two housing blocks, about 17,300m', using Kingframe KBS. The one-storey community building will have a hot-rolled steel frame because of large open spans. This made it ideal for the use of Kingframe AFS (see overleaf), also installed by Kingspan. The contract value is about £2m.
机译:米尔顿·凯恩斯(Mlton Keynes)的申利伍德(Shenley Wood)的ExtraCare退休村将是Willmott Dixon Homes使用KBS的第四个项目,由Kingspan设计,制造和安装钢框架,隔热墙板和地板盒。该计划的第一阶段由建筑师Nicol Thomas设计,包括两个街区中的184套公寓和一栋一层的社区建筑,其中将包括健身房,IT套件,木制品商店和冬季花园。金斯潘正在使用Kingframe KBS建造大约17300m'的两个房屋中的第一个。由于开放的跨度较大,一层的社区建筑将采用热轧钢框架。这使得它非常适合使用也由Kingspan安装的Kingframe AFS(请参阅下页)。合同价值约为200万英镑。

著录项

  • 来源
    《Building》 |2010年第47期|p.69|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:36:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号