首页> 外文期刊>Automation Science and Engineering, IEEE Transactions on >Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation
【24h】

Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation

机译:具有居住时间约束和活动时间变化的双臂机群工具的可调度性分析和最优调度

获取原文
获取原文并翻译 | 示例

摘要

With wafer residency time constraint of cluster tools in semiconductor manufacturing, activity time variation can make an originally feasible schedule infeasible. Thus, it is difficult to schedule them and schedulability is a vitally important issue. With bounded activity time variation considered, this paper addresses their real-time scheduling issues and conducts their schedulability analysis. A Petri net (PN) model and a control policy are presented. Based on them, this paper derives closed-form schedulability conditions. If schedulable, an algorithm is developed to obtain an offline periodic schedule. This schedule together with the control policy forms a real-time schedule. It is optimal in terms of cycle time and can be analytically computed, which represents significant advance in this area.
机译:由于在半导体制造中群集工具的晶圆驻留时间受到限制,活动时间的变化会使原本可行的时间表变得不可行。因此,难以调度它们,并且可调度性是至关重要的问题。考虑到活动时间的变化,本文解决了他们的实时调度问题并进行了可调度性分析。提出了Petri网(PN)模型和控制策略。基于它们,本文推导了封闭形式的可调度性条件。如果是可调度的,则开发一种算法来获取脱机定期调度。该时间表与控制策略一起形成实时时间表。就周期时间而言,它是最佳的,并且可以进行分析计算,这代表了该领域的重大进步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号