首页> 外文期刊>IEEE Transactions on Applied Superconductivity >Electrical Integrity Tests During Production of the LHC Dipoles
【24h】

Electrical Integrity Tests During Production of the LHC Dipoles

机译:LHC偶极子生产过程中的电气完整性测试

获取原文
获取原文并翻译 | 示例

摘要

For the LHC dipoles , mandatory electrical integrity tests are performed to qualify the cold mass (CM) at four production stages: individual pole, collared coil, CM before end cover welding and final CM. A description of the measurement equipment and its recent development are presented. After passing the demands set out in the specification, the results of the tests are transmitted to CERN where they are further analyzed. The paper presents the most important results of these measurements. We also report a review of the electrical nonconformities encountered e.g. inter-turn shorts and quench heater failure, their diagnostic and the cures.
机译:对于LHC偶极子,在四个生产阶段执行了强制性的电气完整性测试,以鉴定冷块(CM):单个极,套圈线圈,端盖焊接之前的CM和最终的CM。介绍了测量设备及其最新发展的描述。通过规范中规定的要求后,测试结果将传输到CERN,并在此进行进一步分析。本文介绍了这些测量的最重要结果。我们还报告了对所遇到的电气不合格品的审查,例如匝间短路和淬火加热器故障,诊断和解决方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号