首页> 外文期刊>IEEE Transactions on Applied Superconductivity >Completion of the Manufacturing of the ATLAS Barrel Toroid Magnet at CERN
【24h】

Completion of the Manufacturing of the ATLAS Barrel Toroid Magnet at CERN

机译:在欧洲核子研究中心完成ATLAS桶形环形磁体的制造

获取原文
获取原文并翻译 | 示例

摘要

The last two years have seen the completion of the integration and the cryostating of 8 superconducting coil windings for the ATLAS Barrel Toroid air-core magnet (BT). The Barrel Toroid is a 20 m in diameter, 25 m long and 5 m wide superconducting magnet for ATLAS, one of the two experiments dedicated to the search of the Higgs boson, which will be installed on the LHC ring at CERN in 2006. The paper presents the last steps of this integration progress which ends with the cold acceptance tests. A special emphasis is put on the integration of the cold mass into the vacuum vessel. The integration of the windings in their coil casings has been completed in October 2003 and the last coil cryostating was performed in June 2005. The BT coils are now being installed in the ATLAS cavern at CERN.
机译:在过去的两年中,已经完成了对ATLAS桶形环形空心磁体(BT)的8个超导线圈绕组的集成和低温化。桶形环是直径20 m,长25 m,宽5 m的ATLAS超导磁体,这是两个专门用于搜索希格斯玻色子的实验之一,该实验将于2006年安装在CERN的LHC环上。本文介绍了集成过程的最后步骤,最后是冷验收测试。特别强调将冷块整合到真空容器中。绕组在线圈壳体中的集成已于2003年10月完成,最后一次线圈冷冻已于2005年6月进行。BT线圈现已安装在CERN的ATLAS洞穴中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号