首页> 外文期刊>Applied Mathematical Modelling >Analytic solutions for twin tunneling at great depth considering liner installation and mutual interaction between geomaterial and liners
【24h】

Analytic solutions for twin tunneling at great depth considering liner installation and mutual interaction between geomaterial and liners

机译:考虑到衬垫安装和衬底衬里之间的相互相互作用,对双隧道的分析解决方案

获取原文
获取原文并翻译 | 示例

摘要

Analytic solutions for stress and displacement of twin tunneling at great depth considering liner installation and mutual interaction between geomaterial and liners are the key context in this paper. Twin tunneling is a continuous procedure, in which after one tunnel is excavated and lined, the other one is hysteretically excavated and lined. The presented solutions mainly focus on stress and displacement in geomaterial and liners for the hysteretical phases through an iterative combination of the complex variable method and the Fourier transform via the Schwarz alternating method. The presented solutions are verified by comparing to a corresponding numerical solution of a general case, in which a good agreement is observed after three iterations. Subsequently, a dimensionless parametric investigation is performed to investigate the influence of tunnel geometry (including twin tunnel spacing, relative angle of twin tunnels and relative size of twin tunnels), liner properties (including liner thickness and liner installation), and lateral stress coefficient on stress and displacement in both liners and geomaterial. (C) 2019 Elsevier Inc. All rights reserved.
机译:考虑到衬里安装和地理和衬垫之间的相互相互作用,对双隧道的应力和位移的分析解决方案是本文的关键上下文。双隧道是一种连续的过程,其中在一个隧道被挖掘和衬里之后,另一个隧道滞后和衬里。所提出的解决方案主要通过复杂的可变方法和傅立叶交换方法的迭代组合来关注歇斯底电区的地磁和衬里中的压力和位移。通过比较常规情况的相应数值解决方案来验证所提出的解决方案,其中在三次迭代后观察到良好的一致性。随后,进行维度参数调查,以研究隧道几何形状的影响(包括双隧道间距,双隧道的相对角度和双隧道的相对尺寸),衬里特性(包括衬垫厚度和衬垫安装),以及横向应力系数衬里和地理材料中的压力和位移。 (c)2019 Elsevier Inc.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号