首页> 外文期刊>IIE Transactions >Generating daily production schedules in process industries
【24h】

Generating daily production schedules in process industries

机译:生成加工行业的每日生产计划

获取原文
获取原文并翻译 | 示例

摘要

We study the problem of generating daily production schedules in a two-stage production system that is typical of many processing industries. We first describe the problem as it occurs in practice, and then present an integer programming model that mmaximizes a weighted sum of the customer orders to be processed in a day's work when a priori production sequences are specified at some stations. Bounds on the optimal solution are obtained by a lagrangian relaxation, and two heuristic procedures are developed and tested empirically. We show how these procedures can be incorporated in an interactive solution scheme to generate good production schedules.
机译:我们研究了在许多加工行业典型的两阶段生产系统中生成每日生产计划的问题。我们首先描述实际中出现的问题,然后介绍一个整数编程模型,当在某些工位指定先验生产顺序时,该模型使在一天的工作中要处理的客户订单的加权总和最大化。通过拉格朗日松弛获得最优解的界线,并开发了两个启发式程序并进行了经验检验。我们展示了如何将这些程序集成到交互式解决方案中以生成良好的生产计划。

著录项

  • 来源
    《IIE Transactions》 |1995年第5期|p.646-656|共11页
  • 作者单位

    Groupe SORCIIER, Operation et Systeme de Decision, Universite Lztval, Quebec, Canada, G1K 7P4;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 一般工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号