...
首页> 外文期刊>IIE Transactions >Lead-time-oriented production control policies in two-machine production lines
【24h】

Lead-time-oriented production control policies in two-machine production lines

机译:两机生产线中基于交货期的生产控制策略

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The ability to meet target production lead times Is of fundamental importance in modern manufacturing systems producing perishable products, where the product quality or value deteriorates with the time parts spend in the system, and in manufacturing contexts where strict lead time constraints are imposed due to tight shipping schedules. In these settings, traditional manufacturing system engineering methods and token-based production control policies lose effectiveness as they aim at achieving target production rates while minimizing inventory, without directly taking into account the effect on the lead time distribution. In this article, a production control policy for unreliable manufacturing systems that aims at maximizing the throughput of parts that respect a given lead time constraint is proposed for the first time. The proposed policy jointly considers the actual level of the buffer and the state of the second machine in the system and stops the part loading at the first machine if there is unacceptable risk of exceeding the lead time constraint. The effectiveness of this new policy against the traditional kanban policy is quantified by numerical analysis. The results show that this new policy outperforms the kanban policy by providing a tighter control on the production lead time. This approach paves the way to the introduction of new lead time-oriented production control policies to maximize the effective throughput in real manufacturing systems.
机译:满足目标生产提前期的能力在生产易腐烂产品的现代制造系统中至关重要,在现代制造系统中,产品质量或价值会随着零件在系统中花费的时间而变差,并且在制造环境中由于严格的交货期而受到严格的交货期限制运输时间表。在这些情况下,传统的制造系统工程方法和基于令牌的生产控制策略会失去效力,因为它们旨在实现目标生产率同时最小化库存,而没有直接考虑对提前期分配的影响。在本文中,首次提出了针对不可靠制造系统的生产控制策略,该策略旨在使零件的吞吐量最大化,且该零件要遵守给定的交货时间约束。提议的策略共同考虑了缓冲区的实际水平和系统中第二台机器的状态,如果存在超过提前期约束的不可接受的风险,则停止在第一台机器上加载零件。这项新政策相对于传统看板政策的有效性通过数值分析得以量化。结果表明,此新政策通过对生产提前期进行更严格的控制,胜过了看板政策。这种方法为引入新的基于提前期的生产控制策略铺平了道路,以最大程度地提高实际制造系统中的有效吞吐量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号