Deformation Characteristics and Influence Factors of a Shallow Tunnel Excavated in Soft Clay with High Plasticity

机译:高塑性软黏土中浅埋隧道的变形特征及影响因素

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A series of problems, including large deformation of supporting structures, shotcrete peeling, and yielding of the steel frame, occurs constantly during tunnel construction in soft clay layers. These problems considerably raise the risk of tunnel construction. Thus, the deformation characteristics of soft clay around the tunnel during construction must be investigated to guarantee safety. In this research, a field test was conducted on 50 sections of a tunnel, which was built in high-plasticity clay layers. Then, the deformation characteristics of surrounding rocks and influencing laws caused by burial depth, invasion thickness of soft clay, and atmospheric precipitation were discussed. Results indicated that surrounding rocks are most likely to undergo large deformation during tunnel construction when the burial depth of tunnel ranges from 1.5D to 2.5D (D is the tunnel excavation span). Tunnel deformation also increases rapidly when the invasion thickness exceeds 60% of the tunnel height. The ratio between clay thickness and burial depth of the tunnel is another crucial index that could cause a large tunnel deformation as it exceeds 0.25. In addition, a significant correlation was observed between tunnel deformation and rainfall during the construction period. The deformation of surrounding rocks increases rapidly with rainfall and will continually develop for 1-2weeks when the average daily rainfall is greater than 4mm.
机译:在软黏土层的隧道施工过程中,经常出现一系列问题,包括支撑结构的大变形,喷射混凝土剥落和钢框架的屈服。这些问题大大增加了隧道建设的风险。因此,在施工期间必须研究隧道周围软土的变形特性,以确保安全。在这项研究中,对隧道的50个部分进行了现场测试,该隧道建在高塑性粘土层中。然后讨论了埋藏深度,软黏土侵入厚度和大气降水引起的围岩变形特征及影响规律。结果表明,当隧道埋深范围为1.5D至2.5D(D为隧道开挖跨度)时,围岩最有可能在隧道施工过程中发生大变形。当侵入厚度超过隧道高度的60%时,隧道变形也会迅速增加。隧道的黏土厚度与埋藏深度之间的比率是另一个至关重要的指标,当其超过0.25时,可能会导致较大的隧道变形。此外,在施工期间,隧道变形与降雨之间存在显着相关性。周围岩石的变形随降雨而迅速增加,并且当日平均降雨量大于4mm时将持续发展1-2周。

著录项

  • 来源
    《Advances in civil engineering》 |2019年第6期|7483628.1-7483628.14|共14页
  • 作者单位

    Cent S Univ Sch Civil Engn Changsha Hunan Peoples R China|Cent S Univ Key Lab Engn Struct Heavy Haul Railway Changsha 410075 Hunan Peoples R China;

    Cent S Univ Sch Civil Engn Changsha Hunan Peoples R China;

    China Tunnel Construct Co Ltd Chongqing Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号