首页> 美国卫生研究院文献>Springer Open Choice >Scheduling multi-task jobs with extra utility in data centers
【2h】

Scheduling multi-task jobs with extra utility in data centers

机译:在数据中心内利用额外的工具调度多任务作业

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper investigates the problem of maximizing utility for job scheduling where each job consists of multiple tasks, each task has utility and each job also has extra utility if all tasks of that job are completed. We provide a 2-approximation algorithm for the single-machine case and a 2-approximation algorithm for the multi-machine problem. Both algorithms include two steps. The first step employs the Earliest Deadline First method to compute utility with only extra job utility, and it is proved that it obtains the optimal result for this sub-problem. The second step employs a Dynamic Programming method to compute utility without extra job utility, and it also derives the optimal result. An approximation result can then be obtained by combining the results of the two steps.
机译:本文研究最大化作业调度的效用的问题,其中每个作业包含多个任务,每个任务都有效用,并且如果该作业的所有任务都完成了,那么每个作业还具有额外的效用。我们为单机情况提供了一种2逼近算法,为多机问题提供了一种2逼近算法。两种算法都包括两个步骤。第一步采用最早截止日期优先方法仅需额外的作业效用即可计算效用,并证明该子问题获得了最佳结果。第二步采用动态编程方法来计算效用,而无需额外的工作效用,并且还可以得出最佳结果。然后可以通过合并两个步骤的结果来获得近似结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号