传统人工操作的桥梁张拉技术已经很难满足当下高难度的施工要求。智能张拉能使用电脑全程操控,完全排除人为干扰,进一步保障了桥梁的预应力张拉的施工质量,符合相关部分所出台文件的要求。%The traditional manual operation bridge tensioning technology has been difficult to meet the present high chal e-nge construction requirements. Intel igent tensioning can use the computer control al the way and completely eliminate hu-man disturbance, and further protect the construction quality of bridge prestressed tensioning in line with the requirements of related part of the documents.
展开▼