In this paper, according to Fuqing railway station in Fuxia Line and its supporting construction of engineering anal-ysis and practice summary, according to the requirements of t-he engineering and construction conditions, the author analyse-s the technical difficulties of China railway station and suppor-ting the construction project may exist in the process of constr-uction, and puts forward some corresponding suggestions.% 本文主要根据福厦线的福清车站及其配套建筑的工程分析与实践总结,针对该工程的各项要求以及施工条件,分析了我国铁路车站以及配套建筑的工程在施工过程中可能存在的技术难点,并给出相应的建议。
展开▼