Taking Sutong Bridge as the object investigated, the correctness of the geometry control method is verified by numerical simulation analysis. Taking the impact of geometric nonlinearity into account, the impacts of structural geometric profile induced by temporary loads and temperature field during the construction procedure are investigated. The simulation results indicate that only the stage state of the structure during construction is affected. Satisfied outcome of construction control can be achieved based on geometry control method.
展开▼