针对焦柳线洛阳北段更换P50-1/6对称道岔施工进行了介绍,分别阐述了前期准备工作,施工要点,作业程序等内容,并对施工过程进行了总结,得出了宝贵经验,为今后同类工程提供了借鉴和参考。%The paper introduces the replacement of P50-1/6 symmetrical turnout at the north section of Luoyang along Jiaozuo-Liuzhou railway,illustrates the preparation,the construction points and the work procedure,sums up the construction process,and concludes some precious experience,so as to provide some reference for similar projects in future.