The paper discusses the unloading issue at overloading and preloading section on mountainous highway with soft foundation, induces and analyzes the settlement, and puts forward suggestions of unloading condition at overloading and preloading section, with a view to provide guidance for preloading engineering with settlement need.%浅述了某公路工程施工过程中对等超载预压路段卸载的问题,对沉降量进行推算分析,并提出等超载路段卸载情况的建议,以便为其他有沉降需要进行预压的工程建设提供一些参考。
展开▼