For the construction of buildings irregular contour point actinomycetes difficult,time-consuming,labor-intensive problem,the use of total stations and measuring ruler joint approach to the construction of buildings were put point line,and actinomycetes precision point of doing analysis.Point out this method can not only guarantee the accuracy of construction,improve construction efficiency,and can provide an effective method for the measurement of high-rise building construction survey irregularities.%针对不规则建筑物施工轮廓点位放线难度大、耗时、耗力的问题,提出利用全站仪和钢尺联合测量的方法对建筑物施工点位进行放线,并对放线点位的精度作了分析,指出该方法既保证了施工精度,又提高了施工效率,为高层不规则建筑施工测量提供了有效的测量方法.
展开▼