首页> 中文期刊>铁道标准设计 >大型铁路综合客运枢纽站改扩建规划研究——以铁路长春站改扩建为例

大型铁路综合客运枢纽站改扩建规划研究——以铁路长春站改扩建为例

     

摘要

随着高速铁路客运专线和轨道交通引入,既有铁路综合客运站枢纽功能将发生重大变化,综合枢纽能否发挥出最高效率,其改扩建规划建设的研究尤为重要.从大型铁路综合客运枢纽站各种交通衔接、流线组织、换乘设计、客运枢纽的改建、新建等方面进行分析,提出大型铁路客运交通枢纽站改扩建规划技术路线和方法,通过铁路长春客运枢纽站改扩建的归纳总结,对国内类似大型铁路综合客运枢纽站改扩建规划建设有借鉴意义.%With high-speed railway passenger-dedicated line and rail transit coming into being,the terminal function of the existing comprehensive railway passenger station will be changed significantly.Therefore,whether the comprehensive terminal gives its maximum efficiency or not largely depends on how its reconstruction and expansion planning have been researched.By analyzing relevant issues,such as the connection among various traffic modes,streamline organization,interchange design,reconstruction and new construction and so on,the author suggests the technical strategy and method for the reconstruction and expansion planning of large comprehensive railway passenger terminal station.Also,the author makes a summarization on the reconstruction and expansion project of Changchun Railway Passenger Terminal Station,which can serve as reference for the planning research of reconstruction and expansion project of similar large comprehensive railway passenger terminal station in our country.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号