首页> 中文期刊> 《铁道标准设计》 >铁路中间站平面辅助设计系统研究

铁路中间站平面辅助设计系统研究

         

摘要

针对铁路中间站平面设计中地形复杂、约束条件丰富,计算统计多而杂,往往牵一发而动全身,占用了设计人员大量时间和精力的现状,设计了一种基于ARX的AutoCAD二次开发,采用MS Access 2003数据库系统,用VS.Net 2005、Object ARX 2007作为开发平台的铁路中间站辅助设计系统,用于铁路中间站的初步设计.系统地减少了站场平面设计的工作量,为人工细化设计奠定了基础,极大提高了工作效率.%The current situation of railway intermediate station plane design is that; the landform is complex, the constraint condition is various, the calculation and statistics are miscellaneous, and one change may affect the whole, so it often takes designer a lot of time and energy. The paper introduces a new aided design system of railway intermediate station, which is based on ARX for AutoCAD second development, with MS Access 2003 database system, by using VS. Net 2005, Object ARX 2007 as a development platform, for the preliminary design of railway intermediate station. The implementation of this system can reduce the workload of plane design of railway station and yard, can lay a foundation for design refinement by manual work, therefore can boost the design efficiency.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号