首页> 中文期刊> 《铁道标准设计》 >高速铁路5×50 m钢箱混凝土连续结合梁设计研究

高速铁路5×50 m钢箱混凝土连续结合梁设计研究

         

摘要

Continuous composite girder is the system acting jointly by steel and concrete, thus its stress conditions are very complicated and good static and dynamic performances are required. With reference to the steel box-concrete composite continuous girder with span of 5 ×50 m on a high-speed railway line, this paper introduces the computation and analysis of the negative moment area, the application of prestressed concrete slab, the effects of concrete creep and live load, the dynamic performances. The research results show that every single index in the continuous composite girder can be met by means of adjusting the construction order of concrete slab, using rational computation of creep and live load and laying concrete on the base plate of steel box and so on.%连续结合梁作为将钢与混凝土相组合共同参与工作的体系,受力十分复杂,应用中要确保结构具有良好的静力、动力性能。以某高速铁路5×50 m钢箱混凝土连续结合梁为工程背景,介绍设计时对负弯矩区处理、桥面板预应力施加、混凝土徐变和活载效应、动力性能等重点问题的计算和分析,研究表明,通过调整施工顺序、采用合理的徐变及活载计算方法、底板铺设混凝土等措施,可使结构各项指标满足要求。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号